Construction Specialist Mek

Construction Specialist Mek

commonNon-ElementalPhysicalPhysicalCryoCryoPyroPyro

A type of large clockwork meka which also has immeasurable value when utilized in building construction and archeological excavation. Its name comes from an engineer employed by Callas during the construction of the Clementine Line. With Callas' financial backing, this engineer built the legendary "Golden Vessel" – a gigantic piece of construction machinery which was used to dig the Poisson Tunnel. Once the job was complete, this type of clockwork meka was designed with a similar structure but reduced to a smaller scale.

Resistances
Physical Phys 10%Pyro Pyro 10%Hydro Hydro 10%Electro Electro 10%Cryo Cryo 10%Dendro Dendro 10%Anemo Anemo 10%Geo Geo 10%